Intermatic - Intermatic Motor Long Leads Old Style 220V
This item is only available for AccuBlue Home Members
AccuBlue Home is our premiere water testing system. Learn More
Already a member? Log in to access this item.
Intermatic Motor Long Leads Old Style 220V - WG433-20D
Intermatic Motor Long Leads Old Style 220V - WG433-20D
| Voltage: | 240V |
| Manufacturer: | Intermatic |
| Product Type: | Automatic Control |
| Warranty: | 1-Year |
One (1) Year Limited Warranty on Product, see Owner's Manual for a full description of warranty claims and coverage details.